New$10 Sign Up Bonus & $30 Free Trial Reward
Start challenge

Expected shortfall

Also called ES, conditional value at risk, CVaR

The average loss in the worst cases beyond the value-at-risk threshold. Basel rules for bank trading books use it at a 97.5% confidence level because it captures tail losses that VaR misses.

Reading
2 min
Sources
3International bodyResearch
Updated
On this page· 5 sections
  1. How it works
  2. Example
  3. Watch out
  4. Sources
  5. Related terms

Value at risk draws a line and says losses should stay on the safe side of it on most days. It is silent about the days they do not. Expected shortfall answers that question: when the line is crossed, how bad is the loss on average?

The Basel Committee defines it as the average of all potential losses exceeding the VaR at a given confidence level[1]. Acerbi and Tasche put the same idea as the “average of the 100p% worst losses” in a sample of returns, where p is the confidence level[3].

How it works

With a history of results, the steps are:

  1. Sort the results from worst loss to best.
  2. Take the worst slice. At 99% confidence, that is the worst 1% of observations.
  3. Average the losses in that slice.

The VaR figure marks the edge of the slice. Expected shortfall is the mean inside it.

Basel’s trading-book rules fix the settings. Banks using internal models must compute expected shortfall daily, bank-wide and for each trading desk, at a 97.5th percentile, one-tailed confidence level[1]. The calculation starts from a base horizon of 10 days and scales it up for risk factors that take longer to exit, with liquidity horizons running from 10 to 120 days[1]. It is calibrated to the most severe 12-month period of stress available in the data[1].

The reason for the switch is stated in the Committee’s own summary: expected shortfall makes up for VaR’s shortcomings in capturing the risk of extreme losses[2]. Acerbi and Tasche add a mathematical point. VaR fails sub-additivity, the property that a combined portfolio risks at most the sum of its parts, so the VaR of a combined portfolio can exceed the sum of the VaRs of its parts. They present expected shortfall as a coherent alternative[3].

Example

Say two portfolios each have 1,000 daily results, and the 99% VaR of both is $1,000. That is the tenth-worst loss, one matched or exceeded on 10 days.

  • Portfolio A: the ten worst losses are $1,350, $1,300, $1,300, $1,300, $1,250, $1,200, $1,150, $1,100, $1,050 and $1,000. They add up to $12,000, so the expected shortfall is $1,200.
  • Portfolio B: the ten worst are $7,600, $5,000, $4,500, $3,300, $2,600, $2,000, $1,600, $1,300, $1,100 and $1,000. They add up to $30,000, so the expected shortfall is $3,000.

VaR cannot tell the two apart. Expected shortfall shows that B’s bad days cost two and a half times as much.

Watch out

It is an average, not a ceiling. In portfolio B the worst day was $7,600 against an expected shortfall of $3,000.

The number depends on the confidence level. A 97.5% figure averages a wider slice than a 99% figure, so the two are not interchangeable[1].

The tail holds few observations. In the example, a 1,000-day history leaves only ten days to average, so one new extreme day moves the result noticeably.

All terms in Tronexopedia

Your challenge starts here

Start your challengeFree TrialNew
Registration bonus

Get $10 free in your Wallet when you sign up

Register and use your $10 Wallet credit to reduce the price of your first challenge.

The $10 bonus is credited to your personal Wallet and can only be used to reduce the price of a challenge purchase. Credits cannot be withdrawn or used for payouts.

Start now & get $10